
Konecranes has delivered and launched a 1-ton A-Frame manual portal for Royal Selangor International SDN BHD, a leading Pewter manufacturer in Malaysia.
Installed in May 2025Crane supports the important steps of the production process, Photography Vat Operational performanceHuman
Crane has A-Frame durable structure And an 8 -inch brake chopper for smooth manual movement.
Read: Konecranes to produce three ESP.10 cranes to Super Terminais
Pewter moves the melt from the melting station to the molding machine and provides more security Careful investigation In high heat
This reduces manual pressure and allows craftsmen to focus on the hands and feet that defines Royal Selngor products.
Read: Konecranes for delivery 39 cranes for the Finnish transformer plant
“Konecranes offered an ergonomic lifting solution to a royal that meets the needs of their special materials,” said Wilson Lim, a sales manager at Konecrances. Improvement of production flowReduce physical stress on employees and enhance safety at work.
“Our ability to provide a reliable and ergonomic solution tailored to their handmade production environment made us a good partner to support their commitment to quality and accuracy.”
Last month, Konecrances announced that it offers an advanced horizontal transportation system (AHT) and supports the transmission of the ECT EUROMAX terminal to fully electric operations.